Measure the real route
Floor plan distance is shorter than the installed route. Add risers, tray diversions, service loops and the path into the cabinet.
- Keep the permanent link at or below 90 metres
- Reserve 10 metres for patch cords
- Place intermediate cabinets where coverage fails
- Link cabinets with fibre
Record each outlet
Label and certify every run. When a port fails later, the result sheet turns a site investigation into a direct lookup.