Orders confirmed before 2pm leave Nairobi the same working day.Get a quote →

Optical Path & Network Infrastructure Manufacturer & Supplier

Engineered for the entire optical path: From street pole to patch panel

Precision fibre optics, ADSS aerial deployment, structured cabling, active switching, and security communications. Select your supply category below to inspect specs, hardware options, and technical pre-quoting guides.

100% Tested

Insertion & Return Loss

Standards Compliant

ISO9001 / CPR / TIA-568

Custom Lengths

Pre-terminated & Cut-to-fit

Nairobi Warehouse

Immediate Dispatch & Pickup

Rack with patch panels, PoE switching and fibre patching

High Density Rack Architecture

Fibre splicing, PoE switching & copper termination

Zero Compatibility Clashes

Pre-tested optical budget

Single-Source Project Fulfillment

Mixed lists are normal, not awkward

A single site deployment rarely stays inside one category. Aerial fibre lands on a splice tray, the tray feeds an optical switch, and the switch powers PoE IP cameras. Quote the whole chain in one document and compatibility arguments disappear.

  • Single consolidated Bill of Materials (BOM) with itemised pricing
  • Full technical desk verification for transceivers and connector loss budgets
  • Direct dispatch from Nairobi inventory to jobsite

Answers

Questions about the four supply lines

Which supply line covers an aerial fibre route?+

Fibre optic solutions. That line holds ADSS and figure 8 cable, closures, splitters, pigtails and the splicing and OTDR kit.

Span length and sag allowance decide the cable grade, so send the pole spacing.

Do you supply and also advise on the design?+

The desk reviews specifications, builds bills of materials and gives configuration guidance. Installation is carried out by your crew or a partner.

Certification and testing gear is supplied so the link can be proven at handover.

Can a single order mix fibre, copper, networking and CCTV?+

Yes. One quotation can carry all four lines with a single delivery note.

That keeps one reference for procurement and one contact for the account.

How long does a quotation take?+

The technical desk responds within two business hours during working days.

Complex tender schedules are confirmed with a return time when received.

Ready to price your project?

Send your complete bill of materials or specifications to the technical engineering desk and get an itemised quotation with confirmed Nairobi stock availability.